other
  • Communication Engineering
    Communication Engineering
    DC Power Supplies in 5G Communications Testing A 5G radio is measured in a laboratory, not on a tower. Every millivolt of ripple on the bench supply arrives at the antenna as part of the signal, because an amplifier cannot tell supply noise from modulation.     Schematic diagram, not to scale. Both rows show the same amplifier; only the supply changes. WHY THE SUPPLY BELONGS IN THE ERROR BUDGET A massive MIMO array puts sixty-four transmit chains behind one antenna panel, all drawing from the same DC bus. Whatever rides on that bus reaches the antenna as part of the signal. The error budget for 256QAM leaves about 3.5 percent for everything. If the supply takes a meaningful share, the bench is measuring itself. 01 Ripple that becomes a radio problem Ripple on the bias rail changes the amplifier's gain on every cycle. That amplitude modulation becomes phase modulation inside the device, and the constellation spreads from clean clusters into a cloud. 5G NR carries up to 256QAM, eight bits per symbol. The closer the points, the less room for anything else to move them. The effect cuts both ways: a noisy supply can fail a compliant device, and an unusually quiet one can pass a marginal one. Either way the report is not the device's number. 02 Minus forty-eight volts, and why Telecom equipment runs on −48 V DC with the positive terminal grounded. The convention dates from the telegraph era, when grounding the positive rail limited corrosion of buried cable. A test supply must float its output or invert it. TDD makes the load worse. Uplink and downlink alternate on a millisecond scale, so current steps rather than drifts, and the supply must hold regulation through those steps without overshoot. Rectifier modules meet the same problem from the other side: in parallel operation, one module dropping offline leaves the rest to absorb the load, so the bench has to hold voltage while the current moves. 03 Seventy-two hours on the aging rack A burn-in rack holds dozens of radios at once. A single 5G active antenna unit can draw over a kilowatt, so a full rack is tens of kilowatts running for days, all ending as heat in the room. Regenerative supplies return that energy to the grid instead of burning it in resistors. On a rack that never stops, the difference shows on the electricity bill before it shows in any specification. The rack also runs unattended overnight, so the supply must be the thing nobody watches. Ambient temperature matters as much as load. A rack at forty degrees ages the output capacitors faster than the datasheet predicts, and drift matters more than accuracy. THREE REFERENCES THAT DECIDE WHETHER A SUPPLY BELONGS ON A 5G BENCH All three are about whether the test setup can be trusted, not about what the supply can deliver: Specification Reference What it settles Supply noise 3GPP TS 38.104 Whether the bench leaves the device enough EVM margin to pass on its own merits Conformance conditions 3GPP TS 38.141 Whether the setup reproduces the conditions the standard assumes Output configuration −48 V, positive ground Whether the supply can float or invert to match telecom practice The number that gets blamed is always EVM — and the supply is the last thing anyone thinks to check.
  • Robot application fields
    Robot application fields
    DC-DC Converters for Mobile Robots and AGVs The hard part of robot power is not the voltage. It is that the bus never sits still: a 48 V pack reads 40 V under acceleration and 60 V the instant a motor brakes downhill.     Schematic diagram, not to scale. One battery bus feeds every low-voltage rail through a single converter. WHY THE BUS, NOT THE BATTERY, SETS THE SPECIFICATION A mobile robot carries one battery and a dozen loads that each want a different voltage. Between them sits a converter, and it sees everything the drivetrain does to the bus — the sag when four motors start together, the overshoot when they stop, and the inrush every time the robot docks. Designing to the nominal voltage is the most common mistake in this segment. The converter has to survive the envelope, not the label. 01 The mobile platform AGV and AMR chassis run a 24 V or 48 V pack, four to eight drive motors, and a growing pile of electronics: lidar, cameras, safety scanners and a compute box. The converter feeding that electronics sees the full swing of a battery under load, plus the back-EMF of motors braking on a ramp. Input range has to cover it without dropping out, and output has to stay clean enough for the sensors to trust it. 02 Joint and actuator electronics In a collaborative arm, every joint carries an encoder, a brake and a drive. Power is distributed along the arm itself, which means the converter has to fit inside the link — often a few cubic centimetres, sometimes on a curved surface. Inside a joint the converter is also a thermal problem: there is no airflow, the housing is the heatsink, and the ambient already includes the motor’s own losses. A part rated for 40 °C in free air is not the same part once it is sealed inside a link. 03 Charging and docking Opportunity charging means a robot docks dozens of times a day. The charger output stage and the on-board converter both see repeated inrush and hot-plug events, and the connector is usually the first thing to fail. Hot-plug is the test that separates a converter from a component: the input sees the full battery voltage applied in microseconds, through a connector that may bounce. Input transient suppression and inrush limiting belong to the power design, not to the accessory list. WHAT SEPARATES ROBOT-GRADE FROM INDUSTRIAL Three references come up repeatedly in procurement, and none of them is about the nominal voltage: Specification Reference What it settles Vehicle electrical safety EN 1175 Whether the electrical system is safe on an industrial truck or AGV Immunity and emission IEC 61000-6-2/-6-4 Whether the converter survives motor noise and does not add to it Functional safety IEC 61508 Whether the power path can be part of a safety function The number that gets missed is not the nominal voltage — it is what the bus does in the 200 ms after a motor stops.
  • Photovoltaic
    Photovoltaic
    DC-DC Converters in Solar Photovoltaic Systems A photovoltaic string is not a battery. Irradiance sets the current and cell temperature sets the voltage, so the input moves with the weather rather than with the load. A converter specified at one nameplate value is specified for a condition that occurs a few hours a year.     Schematic diagram, not to scale. The operating point moves with irradiance and cell temperature, not with the load. WHY THE INPUT IS A CURRENT SOURCE, NOT A VOLTAGE Every supply in a plant sits downstream of a current source. A module holds close to its short-circuit current until the voltage nears open circuit, then the current collapses. The maximum power point moves with irradiance, cell temperature and shading, so the converter must work along that curve, not at one fixed input. The second constraint is time. A plant runs for twenty-five years with no maintenance access to the electronics and one thermal cycle a day, which rules out parts that would be fine indoors. 01 Module-level electronics Optimisers and rapid-shutdown devices mount on the back of a module, in direct sun, for the life of the array. No fan, no service hatch. The housing sees the full swing, from below freezing before dawn to 85 °C on a summer roof, and the converter runs from one module's 30 V to 60 V. The failure that matters is not the one in the first year. It is the electrolytic capacitor that dries out in year twelve, when the module has to come off the roof. 02 String and inverter auxiliaries A 1500 V string feeds the inverter's MPPT stage, and the same bus powers the control board, the communications module and the current sensors. That supply sees the whole string: 1500 V open-circuit on a cold dawn, 1250 V at the maximum power point on a hot afternoon. Isolation is the binding constraint here, not wattage. The auxiliary output is touchable and the input is not, so the barrier must hold at system voltage for the life of the plant. Creepage and clearance come from the standard, not the converter's own rating. 03 Trackers and field auxiliaries A tracker controller sits at the end of a long DC run, drawing tens of watts to move a row of modules a few degrees every few minutes. It runs from a local battery or a dedicated bus, and draws almost nothing while the array is dark. Night load is the specification that gets forgotten. Two watts of standby, multiplied by every row on a fifty-megawatt site, is a number the owner notices. WHAT SEPARATES A PHOTOVOLTAIC-GRADE PART FROM AN INDUSTRIAL ONE Three references decide whether a part belongs on a roof, and all three are about the environment rather than the electronics: Specification Reference What it settles Isolation at system voltage IEC 62109-1 Whether the barrier holds at 1500 V for the life of the plant Environmental testing IEC 60068-2 Whether the housing survives daily thermal cycling outdoors Ingress protection IEC 60529 Whether a module-level enclosure survives rain, dust and washing The number that gets missed is not the efficiency at 25 °C — it is the capacitance still working in year twenty.
  • Industrial Automation
    Industrial Automation
    DC-DC Converters in Industrial Automation A 24 V bus looks like the simplest thing in the plant. It is also the one that runs non-stop for a decade, feeds every inductive load on the line, and is expected to keep working while a contactor opens next to it.     Schematic diagram, not to scale. The drop happens in the run, not in the supply. WHY 24 V IS A RANGE, NOT A NUMBER Industrial control power is specified as 24 V, but nothing in a real cabinet sits at 24 V. The supply is set slightly high, the cable drops voltage over thirty metres, and the load pulls the rest down when it switches on. A converter that only works at the nominal value is a converter that works in the catalogue. The three mounting positions below fail in different ways, and each one needs a different part of the specification. 01 Inside the control cabinet DIN-rail supplies feed PLC racks, remote I/O, signal conditioners and safety relays. This is where the 24 V bus is created, and where redundancy is decided: two supplies in parallel, decoupled by diodes, sharing a load that neither was sized for alone. Sharing is the part that gets skipped. Droop sharing or active ORing is what makes the arrangement work, and the failure mode to design against is not a dead supply but one that sits at the wrong voltage and quietly takes the whole load. 02 Field devices at the end of the cable Sensors, valve islands, encoders and HMI panels sit at the far end of long runs. A supply reading 24.0 V at the cabinet can present 18 V at the device under load, and the device will reset. Converting locally removes the cable from the equation. Local conversion is not free: it puts a switching converter inside a sealed field enclosure, where the ambient is the process temperature and the housing is the only heatsink. The trade is cable drop against thermal margin, and at thirty metres it is usually worth making. 03 Motion and drive electronics Servo drives and VFDs inject noise back onto the bus every switching cycle. The converter feeding the control side has to stay quiet through it — and keep its output within tolerance while the drive regenerates. The requirement is not low output noise on a bench; it is stability into a load that changes in microseconds. WHAT SEPARATES AUTOMATION-GRADE FROM COMMERCIAL Three references decide whether a part belongs in a cabinet, and all three are about what happens when conditions are bad rather than nominal: Specification Reference What it settles Immunity to disturbance IEC 61000-6-2 Whether the converter survives the noise an industrial site generates Emission limits IEC 61000-6-4 Whether it adds noise the rest of the cabinet has to live with Control equipment safety IEC 61131-2, UL 508 The baseline for PLC and industrial control hardware The number that matters is not 24 V — it is the lowest voltage at which the load still runs, usually 18 V.
  • Rail Transit
    Rail Transit
    Railway-Quality DC-DC Converters in Rail Transit Applications Not every converter survives a train. This overview sets out where railway-quality DC-DC converters are actually installed, what each mounting location demands, and which specifications decide whether a part qualifies at all.     Schematic side view, not to scale. Zone numbers match the sections below. WHY THE LOCATION DEFINES THE PRODUCT A railway-quality DC-DC converter is defined less by its topology than by where it has to survive. An industrial converter rated for a clean cabinet at 25 °C will fail on a train — not because the circuit is wrong, but because the environment is: a battery bus that swings from 0.7 to 1.25 times nominal, a supply that disappears for 20 ms at every neutral section, and an enclosure that sits 15 to 25 K above outside air. In practice, these converters are distributed across three zones, and each zone sets a different requirement. The reason they are distributed rather than centralised is straightforward: a single large converter would have to carry low-voltage DC the length of the vehicle, and the resulting voltage drop and radiated noise make that impractical. Each zone gets its own conversion, close to the load. 01 Underframe and bogie area Equipment mounted below the floor sees the full mechanical spectrum — EN 61373 Category 1 vibration, stone impact, brake dust and washdown. Converters here supply door control units, brake electronic control units and axle-level sensors. They need potted or fully encapsulated construction, IP65 or better, and a derating curve that holds at +70 °C rather than the +55 °C an industrial part would quote. 02 Equipment cabinets and electrical rooms This is where most railway-quality DC-DC converters live. Input is the 110 V or 24 V battery bus; output feeds TCMS nodes, network switches, remote I/O, HVAC controllers and lighting circuits. These are usually the smallest units on the vehicle — tens of watts to a few hundred — but there are dozens of them per train, so availability matters as much as efficiency. The requirement here is less about mechanics and more about ride-through: the converter must hold output through the S2 or S3 interruption class without dropping the loads that keep the train’s control network alive. 03 Saloon and driver’s cab Passenger information displays, CCTV, public address, destination signs and cab electronics. Ambient conditions are milder, but EN 45545 fire performance becomes mandatory and audible noise starts to matter — a converter in a ceiling void is a converter the passengers can hear. WHAT SEPARATES RAILWAY-QUALITY FROM INDUSTRIAL Across all three zones, the same three specifications decide the question: the operating temperature class under EN 50155, immunity and emission to EN 50121-3-2, and a documented derating curve rather than a single headline wattage. Specification Reference What it settles Operating temperature class EN 50155 Whether the unit survives the ambient temperature at its mounting point, from OT1 through OT6. Immunity and emission EN 50121-3-2 Whether it disturbs the vehicle’s own signalling, traction and communication systems. Documented derating curve Manufacturer data How much of the headline wattage is actually available at operating temperature. A converter that cannot produce the first and the third on paper is not a railway part, whatever the label says.
  • New energy
    New energy
    DC-DC Converters in Battery Energy Storage An energy storage cabinet never turns off. The battery is always there, the DC bus sits somewhere between empty and full, and every auxiliary load inside draws from it. A converter that expects a stable input has chosen the wrong application.   Schematic diagram, not to scale. There is no isolating switch between the battery and the bus it feeds. WHY THE BUS NEVER SITS STILL A rack of lithium cells is not a fixed voltage source. On a 1500 V system the cluster bus runs from about 900 V at the end of discharge to 1350 V at full charge, following state of charge over hours rather than following the load. The second difference from a generation plant is that nothing here is allowed to stop. A photovoltaic inverter goes dark at sunset. A battery cabinet does not, so its auxiliary supply has no maintenance window and no reboot to fall back on. 01 Cluster-level conversion The cluster converter sits between one rack and the DC bus, and it exists because cells age differently. Without per-cluster conversion the weakest rack sets the current for the whole container, and the stronger ones never reach full charge. The isolation is at system voltage, on a bus that is live whenever the battery holds charge. There is no upstream breaker to make the input safe during service, so the barrier is set by the standard, not by the converter's rating. 02 Rack and BMS supply Every rack carries a BMS that samples cell voltages and balances the pack. That board runs from the cluster it monitors: 900 V to 1350 V in, a few watts at 24 V out, continuously, whether the container is charging, discharging or idle for a month. Standby draw decides the design. A BMS supply that pulls three watts instead of one is 17 kWh a year per rack, drawn from cells that then have to be recharged, and across a hundred racks it reaches the round-trip efficiency figure. 03 Container auxiliaries Fire suppression, thermal management, door access and lighting sit at the container level, fed from the DC bus or from a station supply. The runs are long, the loads are inductive, and the enclosure is outdoors. The requirement that gets missed is surge. A contactor closing on a 1350 V bus produces a transient that a converter specified only for steady-state input passes straight through to the control electronics behind it. WHAT A STORAGE CABINET ASKS FOR THAT A GENERATION SITE DOES NOT Three references cover most of the electrical and environmental envelope, and none of them assumes the DC side can be switched off: Specification Reference What it settles Battery system safety IEC 62619 Whether the electronics survive a venting cell Grid-connected storage IEC 62933-5-2 System-level safety around the converter Power conversion safety IEC 62477-1 Creepage and clearance on a live DC bus The bus is never at zero — every auxiliary supply in the cabinet starts its service life with the battery already charged.
  • Automotive Electronics
    Automotive Electronics
    DC Power Supplies in Automotive Electronics Testing An automotive rail is nominally twelve volts. It spends its working life between six and forty, and the excursions between those numbers are what a component is really tested against. A supply that cannot reproduce the excursion cannot test the part.     Schematic diagram, not to scale. The component sees the full excursion, not the nominal. WHY THE NAMEPLATE VOLTAGE IS NOT THE SPECIFICATION Every automotive component is qualified against a set of waveforms, not a voltage. ISO 16750-2 defines the cold crank, where the terminal falls to six volts while the starter draws hundreds of amps, and the load dump, where a disconnected alternator sends the rail above forty volts. ISO 7637-2 adds the fast transients in between. The bench supply's job is to replay those waveforms precisely enough that the result means something. That is harder than it sounds: the two ends of the range ask opposite things of the output stage. 01 Replaying the vehicle network A cold crank is a slow collapse and a slow recovery; a load dump is a fast rise and a long decay with real energy behind it. A supply that reaches forty volts is not the same as one that reaches forty volts in the time the standard specifies. During load dump the current reverses. The component under test stops absorbing and starts returning energy, and a single-quadrant output has nowhere to put it. The voltage then climbs past the programmed value and the pulse no longer matches the standard. 02 Absorbing what comes back Regenerative braking, motor back-EMF and pack cycling all push current back toward the source. Two-quadrant operation lets one instrument source and sink, which removes the electronic load from the bench and the coordination problem that comes with it. The returned energy can also go back to the grid rather than into a resistor bank. On a bench that runs continuously, that shows on the electricity bill long before it shows in a specification. 03 Repeatability across a production line End-of-line testing runs the same sequence on every unit, several hundred times a shift. The question is not whether the supply is accurate on the first unit, but whether the five hundredth pulse looks like the first, after eight hours of thermal soak in a room that is not air conditioned. Drift decides that, and drift is rarely on the first page of a datasheet. A supply that needs calibration every quarter is a cost the line carries forever. THREE REFERENCES THAT DECIDE WHETHER A SUPPLY BELONGS ON THE BENCH All three are about what the instrument does to the measurement, not what it can deliver: Specification Reference What it settles Transient reproduction ISO 16750-2 Whether cold crank and load dump replay at the specified slew and duration Pulse definition ISO 7637-2 Whether fast transients match the standard shape, not just the endpoints Conducted emissions CISPR 25 Whether the supply itself pollutes the measurement it is making The number that gets missed is not the voltage range — it is whether the two hundredth pulse looks exactly like the first.
leave a message